New 7 sheet ceiling downstairs with knock down texture. Multiple cracks
repaired in hall and master and master ceiling re-screwed and skimmed for
smooth wall. Large patch in kitchen ceiling and match texture in phase
one.
65 12' sheets of new construction plus 20
shts of ceiling finishing and multiple patches and tie in's. Knockdown
ceilings and custom hand texture on walls. Cement floor grinding in mud
room and heated floor installation in entry and mud rooms with self
leveling cement and Ditra. 18" Travertine over Ditra in phase two.
Picture gallery